Keepmoat had been appointed by Together Housing to build a £12m 119-home extra care facility in Darwen, Blackburn. The development included 85 self-contained apartments along with on-site facilities, specifically designed for the over...
Keepmoat had been appointed by Together Housing to build a £12m 119-home extra care facility in Darwen, Blackburn. The development included 85 self-contained apartments along with on-site facilities, specifically designed for the over...
Sigmat are delighted to have been selected as the Light Gauge Steel Framing provider for the upcoming 4* Courtyard by Marriott Hotel at Exeter Chief’s Sandy Park Rugby Ground. The hotel, situated adjacent to Exeter Chief’s home ground,...
When forming LSF structures other components/elements are required to create the finished structure. These elements need to be considered at the early design stage: Substructure LSF structures can be built on various...
Brief & Compelling Summary
A unique and technically challenging build on a tight site - Gledhow Lane is a project that tested the limits of Light Gauge Steel Frame design and provided some challenging and rewarding technical...
Damage to a structure during construction through moisture or fire leads to potential losses/delays to contract and expensive remediation works or even complete loss of structure. A key advantage of LSF when compared to timber frame...
For the purposes of this guide we define hybrid construction as systems that include a combination of hot rolled and cold rolled steel. This is generally in areas where additional hot rolled elements are required to enhance the performance...
Key interfaces with other non-LSF elements are relevant to both load-bearing and non load-bearing systems. Interfaces need to be determined early in the design process to ensure requirements are captured and costed for. Interfaces with...
Sigmat have secured the contract for the upcoming Hampton-by-Hilton in Nuneaton for client BAM. As part of a major regeneration project for the local area, the new hotel located on Abbey Street, contributes to the government’s initiative to...
Backed with over 30 years of international evidence, Passivhaus is a tried and tested solution that provides a range of proven approaches to deliver net zero buildings optimised for a decarbonised grid and augmented for occupant health and...
DAMAGE TO A STRUCTURE DURING CONSTRUCTION THROUGH MOISTURE OR FIRE LEADS TO CONTRACTUAL DELAYS, EXPENSIVE REMEDIATION WORKS OR EVEN COMPLETE LOSS OF STRUCTURE. A KEY ADVANTAGE OF LIGHT STEEL FRAME WHEN COMPARED TO TIMBER STRUCTURES IS FIRE...
Stay in touch: