The Elan Valley Aqueduct - Carlow Concrete

Carlow Concrete were delighted to be involved in the Severn Siphon project. Carlow Concrete were contracted by the Barhale / North Midland Alliance (BNMA) to design, manufacture & install a 3,500m3 pre-cast concrete attenuation tank near Hagley, just outside of Birmingham. Before we look at how this was solved we need to understand the history and current challenges facing the area.

The Elan Valley Aqueduct (EVA) is a 117km long Victorian era water structure built between 1893 and 1904. The aqueduct transports water entirely by gravity from the Elan Valley in Wales to Frankley Water Treatment Works in Birmingham, and comprises a combination of cut and cover conduits, siphons and tunnels. Over 100 years on and this wonderful piece of engineering still provides drinking water to the Severn Trent Water client base in Birmingham.

Wellhouse chambers exist at each of the transition points between tunnel / conduit and siphons. The Severn Siphon Outlet chamber is located on a hillside to the north of the village of Hagley, which is approximately 12km to the West of the city of Birmingham.

As the city of Birmingham has expanded over the past 100 years, so has the village of Hagley. Hagley is now a commuter village for the city of Birmingham with a population of over 6,000 people. With the rapid expansion of Hagley, encroachment of properties and infrastructure on the Elan Valley Aqueduct has increased over the past few decades.

Severn Trent Water identified the need to protect local infrastructure from water escaping from the Severn Siphon Outlet chamber should a blockage occur in the EVA between this chamber at Hagley and Frankley Water Treatment Works in Birmingham. We were going to need to store the volume of water that would drain from the EVA between the Severn Siphon Inlet and Outlet wellhouses. The design solution was a new overflow system and precast concrete attenuation tank to be located at Severn Siphon Outlet chamber near Hagley. Challenge accepted!


The project involved:

- Working closely with BNMA & their lead civil / structural designers, Nicholas O'Dwyer, Carlow Concrete designed and manufactured the most optimum and efficient storage tank to meet project requirements.

- the construction of an underground 3.5m deep precast concrete attenuation tank which connected to a new overflow structure approximately 200m away.

- Our involvement saw over 1,300 tonnes of precast concrete delivered to site for the rapid build.

- The attenuation tank was constructed in just 9 weeks, reducing the initial programme by a massive 8 weeks.

The EVA project was completed successfully in very good time.

You can also download the case study in PDF here. And checkout Carlow Concrete here.


 

Stay in touch:

Industry partners
Twitter 24 Feb @TDSLimited_ gave an exciting speaker session displaying legacy projects Hong Kong Airport & Tottenham Hotspurs Foo… https://t.co/0nr4mj43Sw 20 Feb Thank you to Peter Burchill from @EOS_Framing & Richard Wilson of @SiniatUK for showing us all why offsite needs to… https://t.co/V6c8Q00QCg 19 Feb Nicola Carniato displayed a range of light steel frame case studies at #FocusonFraming including Hunsett Mill, Oslo… https://t.co/vKMNNa0d1Z 18 Feb Thank you, Phil Jasper from #Kingspan for your presentation at #FocusonFraming We all thoroughly enjoyed hearing ab… https://t.co/yvK67XiaZq