LSF Components for Modular Construction

LSF provides an engineered solution and components that are used to form the volumetric box. This document is not intended to cover the entire volumetric modular solution.

Modular construction (aka volumetric construction) significantly reduces time on site, but it may not be the right choice for every project. The pro’s and con’s of modular construction must be understood so that the designer can establish whether this is the correct solution for the project. 

BENEFITS

Significant time saving on-site

Work carried out on-site is more about connecting the plumbing/electrics of each module together and installing the façade.

Reduced safety risks

The majority of work is carried out at floor level within  factory conditions.

Benefits of LSF

See page 2 of the LSFA Specification and Engineering Guide

Cost effective solution

Significant savings can be made due to the repetitive nature of the build along with the reduced on-site requirements (e.g. length of time you need to have a crane on-site) and shorter timeframe required to insure the build stage.

Reduced overall build time

As the building frame, fabric and in some circumstances the contents can be installed while demolition/groundworks are being carried out, overall construction time can be significantly reduced.

CONSIDERATIONS

• Final design is required before modules can be constructed.

• Using a podium structure – great for putting a modular building on top of a retail unit or shopping centre.

• Cranes are always required for all modular projects.

• Site access – is there room to lift (via a crane) the modules to the footprint of the building.

• As with all LSF systems, early discussions with a modular manufacturer is crucial to the success and cost-effectiveness of the build.

>>Download the full LSFA Specification and Engineering Guide via our Library

Image credit: Ayrshire Metals 

 
Radar Communications

Stay in touch:

Industry partners
Twitter 19 Jul Recognising the industry shift towards offsite construction, @Trimble_TeklaUK has released an e-book that aims to r… https://t.co/TOdDOzFYon 13 Jul @Rollalong_Ltd has been approved by @NHBC Accepts, the industry standard accreditation scheme for the residential h… https://t.co/Uj5LNncqAZ 7 Jul RT @EOS_Framing: Very proud to have played a part in the Wembley Park regeneration masterplan, a 312-bed Premier Inn Hotel & 2 mixed-use de… 7 Jul RT @EOS_Framing: #EOS are thrilled to be shortlisted in @ExploreOffsite awards! Congrats to our collaborators @BtsFabs for our joint produc…